|
|
|
|
Location of Meter Socket and Service EntranceBefore construction begins, the property owners should meet with a representative of Sumter EMC to determine the location of service equipment. The owner should then inform the electrician and other contractors of the agreed upon location of the service equipment. The electrician must install the meter socket and entrance cables at the location agreed upon by the member and Sumter EMC. Failure to install the meter socket and entrance cables at the proper location can result in costly changes for the member. If the electrician suggests a different location, before proceeding he must contact Sumter EMC to discuss options in order to minimize additional costs to the member.
[Previous Page - Temporary Service] [Next Page - Permit Requirements]
|
My BusinessBuilding a new home or business? Outdoor Lighting Enhance the beauty of your home or business with outdoor lighting from Sumter EMC. Our outdoor lighting systems are available in a wide variety of styles, and commercial systems are designed with the latest state of the art software. |
|
Copyright 2008, Sumter EMC |